Full Bathroom Rebuild
A complete bathroom rebuild taken down to the studs and built back up โ new tub, tile surround, vanity, floor tile and paint.
Completed Job
Completed JobWhat We Started With
The existing bathroom was tired and past its best โ old finishes, worn surfaces, and a layout that no longer worked for the homeowner. Rather than patching over the top, the right move was a full rebuild: open the walls to the studs, fix anything hidden behind them, and build a fresh, clean bathroom from the ground up.
Step by Step
- 1Opened the walls to the studs so we could see and repair the framing behind the old finishes.
- 2Set a new tub in place and built out the surround with new tile, including an accent band for detail.
- 3Installed a new vanity and fixtures.
- 4Laid new floor tile across the room.
- 5Finished with fresh paint to tie the whole space together.
The Finished Space
A fully rebuilt bathroom โ new tub and tile surround with an accent band, a new vanity, fresh floor tile, and clean painted walls. The room went from worn-out to a bright, usable space, built on a solid, inspected base rather than layered over the old work.
What We Check On Every Job
Homes built before about 1990 get an asbestos test before any demolition โ old floor tile, joint compound, and plaster can contain asbestos, and we will not disturb it without a clearance. Plumbing is done by licensed plumbers and electrical work by an ESA Licensed Electrical Contractor. Every job gets a written contract that spells out scope, materials, and timing, and any change to that scope is handled by a signed change order โ no verbal additions.
Related Services
Want this kind of work in your home?
Book a free in-home consult. We reply fast, usually within the hour.
๐ Call or Text 705-718-2544
Request a Quote
Tell us about your project โ we reply fast, usually within the hour.